휴리스틱 방법을 활용한 고객 생애 가치에 대한 단일 업체 일정계획 수립에 관한 연구

A Study on Determining Single-Center Scheduling for LTV(LifeTime Value) Using Heuristic Method

  • 양광모 (명지대학교 산업시스템공학부) ;
  • 강경식 (명지대학교 산업시스템공학부)
  • 발행 : 2003.03.01

초록

Scheduling plays an important role in shop floor planning. A scheduling shows the planned time when processing of a specific job will start on each machine that the job requires. It also indicates when the job will be completed on every process. Thus, it is a timetable for both jobs and machines. There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty. Based on other objectives, many criteria may serve as s basis for developing job schedules. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility. Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

키워드

참고문헌

  1. 박재현, 양광모, 강경식, 'LTV를 이용한 eCRM을 연계한 ATP 모델 구현에 관한 연구', 산업경영시스템학회, 제25권 제4호, pp54-60
  2. 양광모, 박재현, 강경식, '고객 요구 집단에 의한 일정계획 수립에 관한 연구', 안전경영과학회 2002 추계학술대회, pp221- 226
  3. Dileep R. Sule, 'Industrial Scheduling', PWS Publishing Company, 1996
  4. Erhom, Craig, and John Stark, Competing by Design : Creating Value and Market Advantage in New Product Development, Essex Junction, Vermont : Omneo, 1994
  5. Ertas, Atila, and Jesse C. Jones, The Engineering Design Process, 2nd edition, New York: John Wiley & Sons, 1996
  6. Michael Pinedo, 'Scheduling -Theory, Algorithm, and systems- 2e', Prentice Hall, 2002
  7. Ranjit Bose, 'Customer relationship management: key components for IT success' Industrial Management & Data Systems, Volume 102, Number 2 (March 1, 2002)
  8. SIMON FRENCH, B. A., M. A., D.Phil, 'Sequencing and Scheduling - An Introduction to the Mathematics of the Job-Shop', John Wiley & Sons, 1982