Analysis of Channel Flow Low During Fuelling Operation of Selected Fuel Channels at Wolsong NPP

  • I. Namgung (Korea Power Engineering Co.) ;
  • Lee, S.K. (Korea Electric Power Research Institute)
  • 발행 : 2002.10.01

초록

Wolsong NPP are CANDU6 type reactors and there are 4 CANDU6 type reactors in commercial operation. CANDU type reactors require on-power refuelling by two remote controlled F/Ms (Fuelling Machines). Most of channels, fuel bundles are float by channel coolant flow and move toward downstream, however in about 30% of channels the coolant flow are not sufficient enough to carry fuel bundles to downstream. For those channels a special device, FARE (Flow Assist Ram Extension) device, is used to create additional force to push fuel bundles. It has been showing that during fuelling operation of some channels the channel coolant flow rate is reduced below specified limit (80% of normal), and consequently trip alarm signal turns on. This phenomenon occurs on selected channels that are instrumented for the channel flow and required to use the FARE device for refuelling. Hence it is believed that the FARE device causes the problem. It is also suspected that other channels that do not use the FARE device for refuelling might also go into channel flow low state. The analysis revealed that the channel How low occurs as the FARE device is introduced into the core and disappears as the FARE device is removed from the core. This paper presented the FARE device behavior, detailed fuelling operation sequence with the FARE device and effect on channel flow low phenomena. The FARE device components design changes are also suggested, such as increasing the number or now holes in the tube and flow slots in the ring orifice.

키워드

참고문헌

  1. I.,Namgung, B.G.Na, S.K.Lee, and Y.B.Kim, 'Re-assessment of Remotely Controlled Fueling Machine FARE Device Operational Characteristic of Wolsong NPP', PBNC-2002 Conference, Shenzhen, China, Oct. (2002)
  2. I. Namgung, 'Analysis of Fuelling Sequence and Fatigue Life for 4-Bundle Shift Refuelling scheme in CANDU6 NPP', Journal of KNS, Vol.34, No.2, (2002)
  3. W.F. Waters, 'Fuel String Force Measurement for 37 Element Fuels', AECL-IR280, (1978)
  4. S.Yeramilli and R.S.Morrow, 'Flow Assist Ram Extension (FARE) Method for On-Power Refuelling of Low Channels At Pickering', AECL Memo, (1972)
  5. Wolsong NPP - Flow Assist Ram Extension (FARE) Tool Desion Manual, (1994)
  6. Wolsong NPP - FARE device drawings, 1994
  7. Wolsong NPP - Fuelling Machine Head Design Manual, (1995)
  8. Wolsong NPP - Primary Heat Transport System Design Manual, (1995)