Case Study : Integrated Approach for Prioritization in Automobile Development Process

  • 발행 : 2002.09.01

초록

A successful product development process can not be achieved without a proper focus and prioritization. For this research, the priority is defined as the relative urgency of a system compared to other system in order to develop and launch a successful product. The process of integrated approach for prioritization using ID and Goal Programming is developed. The development of a mid-size car by an internationally reputed automotive company is described as a case study.

키워드

참고문헌

  1. Barassard M., and Ritter D. (Editors), The Memory Jogger, GOAL/QPC,Methuen, MA, 1994
  2. Frontline Systems Inc. World Wide Web site, 'Algorithmic Methods Used by the Solver', http://www.frontsys.com/algonlp.htm.1996
  3. Lasdon L.S., and Smith, S., Solving Sparse Nonlinear Programs Using GRG. ORSA Journal on Computing Vol. 4 No. 1 (1992), pp. 2-15
  4. Lasdon L.S., Waren A., Jain A., and Ratner M., 'Design and Testing of a Generalized Reduced Gradient Code for Nonlinear Programming'. ACM Tran-sactions on Mathematical Software Vol. 4 No. 1 (1978), Pp. 34-50 https://doi.org/10.1145/355769.355773
  5. Singh, N. and Panda, D. N., 'Input output Goal Programming Model for Management Planning of Sehculture Industry,' International Journal of System Science Vol. 20, No. 11, p. 2307, 1989 https://doi.org/10.1080/00207728908910307
  6. Singh, N. Agarwal, S. K. 'Optimum Design of an Extended Octagonal Ring by Goal Programming,' International Journal of Production Research Vol 21, No. 6, p. 891, 1983 https://doi.org/10.1080/00207548308942421
  7. Tachikawa, K. Hitomi, S. A MUIti-Objective Optimization Method by Sequential Linear Programming, SAE Technical Paper Sehes # 880887, 1988