Occasionally, equipment in a distribution system fails due to damage from weather, vandalism, or other causes. Failures and unexpected events do not always occur as and where expected. Therefore, a good contingency plan, multi-zone or otherwise, provides flexibility by locating switches at various strategic locations so that parts of a feeder can be picked up in the event of line outages at various places. It is possible to create feeder system layout that achieve remarkable contingency support economics, even as their normal peak loading levels approach thermal capacity, by utilizing six, seven, or even nine switchable zones per feeder. But many switchable zones per feeder are of questionable practicality and effectiveness, because of the complexity and time required for the switching operation. In practice, a zonal scheme with between three and four zones will usually provide complete contingency backup for all feeders. Line switches have both capital and maintenance costs, the planning for multi-zonal schemes is considerably more difficult than or loop or single-zone systems, and the required switching operations required during contingencies take more time. But multi-zonal schemes are used because these costs come to far less than the cost of additional capacity required for loop or single-zone. In this paper, we present the optimal number of switchable zones per feeder in Kora distribution system.

키워드

참고문헌

  1. H. L. Wills, 'Power Distribution Planning Reference Book', Marcel Dekker Inc., 1997
  2. 한국전력공사 기술연구원, '대용량 배전에 관한 연구(최종 보고서)', 한국전력공사, KRC88D-J01, 1993. 5
  3. 한국전력공사 기술연구원, '배전자동화 알고리즘 정립 및 표준화 연구(최종보고서)', 한국전력공사, KRC-91D-J01, 1993. 5
  4. 한국전력공사 배전처, '22.9kV-Y 배전선로 적정운전용량 기준선정에 관한 연구(최종보고서)', 한국전력공사, EESRI-93P-109, 1994. 10
  5. 한국전력공사 배전처, '배전계획기준(안)', 한국전력공사, 1996. 6