References
- Baker, K. R., Powell, S. G. and Pyke, D. F. (1994), A predictive model for the throughput of unbalanced, unbuffered three-station serial line, IIE Transactions, 26(4), 62-71 https://doi.org/10.1080/07408179408966619
- Blackstone, J. H. Jr. (2001), Theory of constraints - a status report, International Journal of Production Research, 39(6), 1053-1080 https://doi.org/10.1080/00207540010028119
- Chakravorty, S. S. (1996), Robert Bowden Inc.: a case study of cellular manufacturing and drum-buffer-rope implementation, Production and Inventory Management Journal, 37(3), 15-19
- Choi, K. S. (2001), Password for Company Resurrection - TOC, Haneon, Seoul, Korea
- Cook, D. P.(1994), Simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks, Production and Inventory Management Journal, 35(1), 73-78
- Duri, C., Frein, Y. and Lee, H. S. (2000), Performance evaluation and design of a CONWIP system with inspections, International Journal of Production Economics, 64(1-3), 219-229
- Goldratt, E. M. and Cox, J. (1992), The Goal, North River Press
- Hopp, W. J. and Roof, M .L. (1998), Setting WIP levels with statistical throughput control (STC) in CONWIP product Ion lines, International Journal of Production Research, 36(4), 867-882 https://doi.org/10.1080/002075498193435
- Hopp, W. J. and Spearman, M. L. (1991), Throughput of a constant work in process manufacturing line subject to failures, International Journal of Production Research, 29(3), 635-655 https://doi.org/10.1080/00207549108930093
- Jeong, N. K. (1999), TOC-Constraint Management, Daecheong Media, Seoul, Korea
- Koh, S. G. and Kim, J. H. (2002), Implementation of DBR system with Kanban in a production line of static demand, IE Interfaces, 15(1), 99-106
- Koh, S. G. and Yoon, H. Y. (2001), On the size of the constraint buffer in the TOC, IE Interfaces, 14(4), 334-340
- Miltenburg, J. (1997), Comparing JIT, MRP and TOC, and embedding TOC into MRP, International Journal of Production Research, 35(4), 1147-1169 https://doi.org/10.1080/002075497195597
- Powell, S. G. (1994), Buffer allocation in unbalanced three-station serial lines, International Journal of Production Research, 32(9), 2201-2217
- Powell, S. G. and Pyke, D. F. (1996), Allocation of buffers to serial production lines with bottlenecks, IIE Transactions, 28(1), 18-29 https://doi.org/10.1080/07408179608966249
- Powell, S. G. and Pyke, D. F. (1998), Buffering unbalanced assembly systems, IIE Transactions, 30(1), 55-65 https://doi.org/10.1080/07408179808966437
- Radovilsky, Z. D. (1998), A quantitative approach to estimate the size of the time buffer in the theory of constraints, International Journal of Production Economics, 55(2), 113-119 https://doi.org/10.1016/S0925-5273(97)00131-X
- Russel, G. R. and Fry, T. D. (1997), Order review/release and Jot splitting in drum-buffer-rope, International Journal of Production Research, 35(3), 827-845 https://doi.org/10.1080/002075497195731
- Schragenheim, E. and Ronen, B. (1990), Drum-buffer-rope shop floor control, Production and Inventory Management Journal, 31(3), 18-22
- Spearman, M. L., Woodruff, D. L. and Hopp, W. J. (1990), CONWIP: a pull alternative to kanban, International Journal of Production Research, 28(5), 879-894 https://doi.org/10.1080/00207549008942761