Nonlinear Flexural Analysis of PSC Test Beams in CANDU Nuclear Power Plants

  • Published : 2000.04.01

Abstract

In this study, nonlinear analyses of prestressed concrete(PSC) test beams for inservice inspection of prestressed concrete containments for CANDU nuclear power plants are presented. In the analysis the material nonlinearities of concrete, rebar and prestressing steel are used. To reduce the numerical instability with respect to the used finite element mesh size, the tension stiffening effect has been considered. For concrete, the tensile stress-strain relationship derived from tests is modified and the stress-strain curve of rebar is assumed as a simple bilinear model. The stress-strain curve of prestressing steel is applied as a multilineal curve with the first straight line up to 0.8fpu. To prove the validity of the applied material models, the behavior and strength of the PSC test specimens tested to failure have been evaluated. A reasonable agreement between the experimental results and the predictions is obtained. Parametric studies on the tension stiffening effects, the impact of prestressing losses with time, and the compressive strength of concrete have been conducted.

Keywords

References

  1. CSA Standard CAN3-N287.7-M82,'Design Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants,' Dec., (1982)
  2. Choun,Y.S.,and Lee,H.P.,' Structural Behavior of Aged Containment Building under Internal Pressure', Proceedings of the Korean Society of Civil Engineers, Vol(I), Seoul, Korea, pp.583-590, Oct. (1998)
  3. KAERI, 'Development of Integrated Nuclear Safety Assessment Technology, KAERI/PR/98, (1893)
  4. Choun,Y.S., and Lee,H.P.,' Nonlinear Behavior of a Prestressed Concrete Containment Building with Material Degradation,' Proceedings of the Korean Nuclear Society Spring Meeting, Seoul, Korea, May, (1999)
  5. Ashar, H., and Jeng, D., 'Effectiveness of Inservice Inspection Requirements of Prestressed Concrete Containments-U.S.Experience,, Int'l Conf. on containment design and operation, (1990)
  6. CSA Standard CAN3-N287.7-M80 , 'In-Service Examination and Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants,' April, (1980)
  7. Pandey, M.D., 'Reliability-Based Inspection of Prestressed Concrete Containment Structures,' AECE Project, No.2.247.3, Canada, March, (1996)
  8. Bae, I.H., Choi,I.K. and Seo,J.M., 'Nonlinear Analysis of PSC Test Beams in CANDU Nuclear Power Plants,' Proceedings of the Korean Nuclear Society Spring Meeting, Seoul,Korea, Oct, (1999)
  9. KOPEC,'The 1st Year In-Service Inspection of Wolsung N.P.P Unit 2 Containment Building Post-Tensioning System', June, (1998)
  10. KOPEC, 'Report for 2nd In-Service Inspection of Wolsung N.P.P. Unit 2 Containment Building Post-Tensioning System,' Dec. (1998)
  11. Scott, B.D., Park, R., and Priestley, M.J.N., 'Stress-Strain Behavior of Concrete Confined by Overlapping Hoops at Low and High Strain Rates', ACI, Vol.79, No.1, pp.13-27, (1982)
  12. Hsu,T.C., 'Unified theory of Reinforced Concrete,' CRC, pp.204-205
  13. Mattock,A.H., 'Modification of ACI Code Equation for Stress in Bounded Prestressed Reinforcement at Flexural Ultimate,' ACI Journal, Proceedings, Vol.82,No.4, pp.331-339, July-Aug.,(1984)