Magazine of the Korea Concrete Institute (콘크리트학회지)
- Volume 10 Issue 5
- /
- Pages.42-46
- /
- 1998
- /
- 1018-1415(pISSN)
DOI QR Code
New Rehabilitation Method of Prestressed Concrete Rahmen Bridge with a Hinge at Midspan
프리스트레스트 콘크리트 활절 라멘교의 신보강공법-상진대교 구교 적용
Abstract
Keywords