A Study on the Management of Subway Structure as an Underground Facility

지하 시설물로서의 지하철 구조물 관리 방안에 관한 연구

  • Published : 1997.06.01

Abstract

Since beginning of subway construction in 1974, for supplying the demand for increasing urban traffic and solving the traffic jam due to expansion of society and elevation of an individual income, the $1^{st}\;and\;2^{nd}$ construction have been almost done and $3^{rd}$ has been driving forward. However, according to an increment of com-mon usage with the passage of time, structures are superannuated and the amount of improvement and repairs keeps on increasing continuous. And many problems are taking place at underground space because of new constructions for underground facilities such as urban gas, electric power, waterworks, and sewerage. In consequence. The consideration of a counterplan for safety is required deeply This study analyzed problems on maintenance of structure about $1^{st}$ class subway, and will present means that a manage civil structures scientifically and systematically by using GSIS concept that imported into several organizations for facility management recently as making digital graphic elements and historic data into a database rather than using an old method - documents and paper drawings.

사회의 발전 및 개인 소득 수준의 향상으로 인하여 증가하는 도시 교통 수요의 충족 및 교통난 해소 방안의 일환으로 1974년부터 지하철의 건설이 시작된 이래로 1기 및 2기 지하철의 건설이 완료되어 가고 3기 지하철의 건설이 추진되고 있다. 따라서 기존 건설된 지하철은 공용 년수의 증가로 인하여 구조물이 노후화 되고 있어 이로 인해 개·보수 물량이 지속적으로 증가하고 있고 도시가스, 전력, 상하수도 등 여타 지하 시설물의 개량 및 신규 건설로 인해 지하 공간에서 잦은 문제가 발생하고 있어 이에 대한 안전 대책 마련이 절실히 요구되고 있다. 따라서 본 연구에서는 이미 건설되어 공용중에 있는 1기 지하철을 대상으로 지하철 구조물의 유지보수 상의 문제점을 분석하였다. 그리고 최근 여러 기관에서 시설물의 관리에 도입되고 있는 지형공간정보체계(GSIS)개념을 응용하여 현행문서 및 종이도면 위주의 구조물 유지관리 방법에서 수치화된 도형 요소와 이력 자료를 데이타베이스화 함으로서 지하 시설물로서의 토목 구조물을 보다 체계적이고 과학적으로 관리할 수 있는 방안을 제시하고자 한다.

Keywords