Quick Order Acceptance Evaluation System with due dates in mold manufacturing factory

금형공장에서의 납기에 의한 신속 수주 평가시스템

  • 이무성 (한국과학기술원연구원CAD/CAM연구실) ;
  • 노형민 (한국과학기술원연구원CAD/CAM연구실) ;
  • 이순요 (고려대학교 산업공학과)
  • Published : 1994.12.31

Abstract

In an order-oriented production system such as mold manufacturing, the production starts with an order acceptance, and the production planning is set up according to the accepted order information. Such a work can be done through a dynamic process management system which can reflect shop floor situation dynamically. In this paper, so called the Quick order acceptance evaluation system that can investigate order confirmation quickly, is discussed. When an order is asked, this system must consider the time constraint to determine whether to accept or not, and must be reliable when the determined results are used in the shop floor. For this system, firstly, we simplified the machines by grouping based on their operation capabilities, secondly, we conducted load analysis to calculate available capacities during given periods using heuristic method instead of mathematical algorithm, thirdly, expert can input his experienced knowledge into the system interactively when simulation results don't meet the required due dates. As a case study, we applied this system to an injection mold manufacturing factory.

Keywords