Job Sequencing Problem for Three-Machine Flow Shop with Fuzzy Processing Times

  • Published : 1993.04.01

Abstract

This paper presents possibilistic job scheduling based on the membership function as an alternative to probabilistic job scheduling and illustrates a methodology for solving job sequencing problem which the opinions of experts greatly disagree in each processing time. Triangular fuzzy numbers are used to represent the processing times of experts. Here, the comparison method is based on the dominance property. The criteria for dominance are presented. By the dominance criteria, for each job, a mojor TFN and a minor TFN are selected and apessimistic sequence with mojor TFNs and an optimistic sequence with minor TFNs are computed. The three-machine flow shop problem is considered as an example to illustrate the approach.

Keywords