0-1 Pprogramming Formulations for Assembly Line Balancing of Large-Sized Pproduct

대형제품의 조립라인 밸런싱을 위한 0-1 정수계획모형

  • 김여근 (전남대학교 공과대학 산업공학과) ;
  • 귄선희 (전남대학교 공과대학 산업공학과)
  • Published : 1992.04.01

Abstract

There are takes performed on only one side (right side or left side) of the assembly line, and task groups in which the tasks are more related to one another like a subassembly. In the Assembly Line Balancing (ALB) of the large-sized product such as bus and truck, the side on which tasks are performed and the related task groups should be considered to improve work methods and to appropriately lay out parts and facilities in the line. In this paper, presented are the 0-1 programming formulations for the ALB with the constraints of assigning the same side tasks to the station. The objective of minimizing the number of stations is combined with the objective that the total number of the related task groups handled by all the stations is minimized. Also, proposed are the methods of reducing the number of variables and constraints, and of determining the station to which subassembly tasks are assigned.

Keywords