고층 아파트의 건축설비 운용실태에 관한 연구 - 난방설비 및 급수설비를 중심으로 -

A Study on the operating of building equipment in apartment building - With reference to heating equipment and water-supply facilities -

  • 발행 : 1991.12.01

초록

In this study, the operation(heating) period of heat source(boiler) machineries in apartment building for periodic heat load analysis has been established by investigating their heat source machineries actural operation period, energy consumption, the capacity of heat source machineries, and their building element. Thus, the purpose of this paper is at bring up the various pre-estimate expression for energy conservatiove, efficient operation and amount of water supplied.

키워드