A Development of Heuristic Algorithms for the n/m/D/F/Fmax Scheduling Problem

n/m/D/F/Fmax 스케쥴링 문제의 휴리스틱 알고리듬 (II)

  • Published : 1989.05.01

Abstract

This paper considers a multi-stage flowshop scheduling Problem where the setup times of jots depend on immediately preceding jobs. Three heuristics algorithms, CAMPBELL, PEIDAN and CAMRING are proposed. The performance measure is a minimization of makespan. The parameters of simulation model are PS(ratio of the processing times to setup times), M(number of machines), and N(number of job). This simulation model for each algorithm is a 4$\times$3$\times$3 factorial design with 360 observations. The makespan of the proposed heuristic algorithms is compared with the optimal makespan obtained by the complete enumeration of schedules. This yardstick of comparison is defined as a relative error. The mean relative error of CAMPBELL, PEIDAN, and CAMRING algorithms are 4.353%, 7.908%, and 8.578% respectively. The SPSS, is used to analyse emphirical results. The experimental results show that the three factors are statistically significant at 5% level.

Keywords