품질경영학회지 (Journal of Korean Society for Quality Management)
- 제15권1호
- /
- Pages.76-81
- /
- 1987
- /
- 1229-1889(pISSN)
- /
- 2287-9005(eISSN)
수리일정계획(修理日程計劃)과 보수반원(補修班圓)크기의 동시적(同時的) 결정(決定)에 관한 연구(硏究)
On the Simultanously Determining the Schedule and Crew Size for Optimal Preventive Maintence
- 발행 : 1987.06.15
초록
Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper suggests a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies.
키워드