A Study on Critical Ratio Scheduling for Determining the Relative Priority
상대적(相對的) 작업우선순위(作業優先順位) 결정(決定)을 위한 긴급율법(緊急率法)에 관한 사례연구(事例硏究)
Abstract
The purpose of this paper is to find out the relative priority among the queueing products for next operation. Critical ratio scheduling is a technique for use in production scheduling to establish and maintain relative priority among the jobs. The relative priority is based on a ratio of when the completed job is required and how much time is required to complete it. A numerical example of "D" company is solved. Jobs are classified into 3 categories; the behind scheduling jobs, the on time jobs and the ahead scheduling jobs.