A Study on Drainage Capability of Large Capacity Outlet and Spillway of Dams in Korea

한국댐의 대용량 배수시설 및 Spillway 배수능력에 관한 조사연구

  • 이원환 (본 학회 이사 편집위원장 연세대학교 공과대학 교수 공학박사)
  • Published : 1978.12.01

Abstract

Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.

본 연구는 국내 대댐(ICOLD규정에 의한 대댐) 647개를 대상으로 건설실적과 분류를 통하여 체계화하였으며 특히 대용량 배수설비 및 여수토의 배수능력을 진단함으로써 앞으로의 대용량 배수설비 계획방침을 제안한 것이다. 본 연구를 통하여 얻어진 성과를 요약하면 아래와 같다. 1. 국내댐의 용도별 분류로 보면 94%가 관개용댐(647개중 607개)이며 발전용댐이 2%(14개) 생활 및 공업용수댐이 26개로 4%이다. 2. 계획방류량 설정에서 관개용 댐의 spillway에서는 100년 확률홍수량을 택하고 있으며 생활 및 공업용수댐의 spillway는 200년, 발전용댐에서는 500년 또는 1,000년을 택하고 있으나 소규모 Spillway에서는 500년 이상을, 대규모 Spillway에서는 1000년 이상 또는 PMF를 택해야 할 것이다. 3. Spillway는 방재공학적 견지에서 반드시 고려되어야 하겠으며 그 기획규모를 확률년도 등급(안)을 제안하였다. 4. 몇가지 문제점을 제기하여, 앞으로의 과제로 하였다.

Keywords