Acknowledgement
본 논문은 행정안전부의 방재안전분야 전문인력 양성사업의 지원을 받아 수행되었습니다.
The shear connection of the vertical construction joint of a slurry wall by the concrete shear key has excellent structural performance and is economical and eco-friendly. However, technology for forming concrete shear keys in the underground is still underdeveloped. This paper proposes the development of the construction technology required to form a concrete shear key at the vertical construction joint of the slurry wall.
본 논문은 행정안전부의 방재안전분야 전문인력 양성사업의 지원을 받아 수행되었습니다.