Acknowledgement
본 논문은 국토교통부 기술혁신과 공사비산정기준관리운영사업(과제번호: 20230025) 및 한국건설기술연구원의 주요사업(건설정책 및 건설관리 발전전략)의 일환으로 수행된 연구임을 밝히며 이에 감사를 드립니다.
In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.
본 논문은 국토교통부 기술혁신과 공사비산정기준관리운영사업(과제번호: 20230025) 및 한국건설기술연구원의 주요사업(건설정책 및 건설관리 발전전략)의 일환으로 수행된 연구임을 밝히며 이에 감사를 드립니다.