Integration of Construction Inspection to Schedule Management

공정관리와 연계한 건설 검측 업무 체계화 방안

  • Published : 2023.05.17

Abstract

The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

Keywords

Acknowledgement

이 논문은 2023년도 한국기술교육대학교 교수 교육연구진흥과제 및 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원(No. 2021R1F1A1062967)에 의하여 연구되었음.