A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data

건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출

  • Published : 2022.11.10

Abstract

The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.