Acknowledgement
본 논문은 한국연구재단의 이공분야기초연구사업 (과제번호 2021R1A2C1007467)과 국토교통부/국토교통과학기술진흥원의 "스마트건설기술개발 국가R&D사업(과제번호 21SMIP-A158708-02)"의 지원으로 수행된 연구입니다.
Demands for digital transformation of the construction industry are increasing to improve the accuracy of the construction operation planning and the performance of the construction operation. Even though large number of studies are being conducted to this date, most of the studies are not likely to be available on the real sites. Therefore, this study provides construction managers with a methodology of drawing construction performance indicators based on productivity analysis using Artificial Neural Network (ANN) models and Web-CYCLONE. This methodology is expected to have high utilization and precision of construction operation planning and management.
본 논문은 한국연구재단의 이공분야기초연구사업 (과제번호 2021R1A2C1007467)과 국토교통부/국토교통과학기술진흥원의 "스마트건설기술개발 국가R&D사업(과제번호 21SMIP-A158708-02)"의 지원으로 수행된 연구입니다.