Acknowledgement
본 논문은 CoP기술연구소의 지원으로 수행된 연구결과임을 밝히며 이에 감사를 드립니다.
As construction projects are gradually getting larger and focusing on building skyscraper with the development of construction technology and the concentration of population in cities, the choice of the soil sheeting works is very important in terms of securing safety and economic feasibility. Further research is planned on the developed concrete guide-based continuous over lap pile method through the introduction of a system that automates vertical management, continuous improvement and supplementation so that the basement soil sheeting wall can be utilized as a building structure.
본 논문은 CoP기술연구소의 지원으로 수행된 연구결과임을 밝히며 이에 감사를 드립니다.