Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2019.11a
- /
- Pages.14-15
- /
- 2019
Case Study of Coordinate Measurement during Construction of Long-Span Irregular Curved Roof Layers
장경간 비정형 곡면 지붕층의 시공중 좌표 계측 사례 연구
- Published : 2019.11.01
Abstract
In this paper, it was tried to prove the possibility and effect of coordinate measurement by using MEP layout equipment at the construction stage, and to propose a method to improve measurement accuracy during construction. For this study, the passenger terminal site, which is a long span structure, was selected and compared with three dimensional CAD drawings and construction measurement results using MEP layout equipment for the precise construction of long-span irregular curved roof layers. As a result, it was found that it is possible to construct three-dimensional curved roof layers using MEP layout equipment through measurement and analysis.
Keywords