Construction Cost Analysis of HPC Method by PC Construction Project Cases

사례분석에 의한 HPC공법의 공사비 분석

  • 노주성 (한국교통대학교 건축공학과) ;
  • 김재엽 (한국교통대학교 건축공학과)
  • Published : 2017.05.17

Abstract

This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

Keywords