Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication

복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출

  • 이동민 (현대건설 연구개발본부) ;
  • 장세준 (현대건설 연구개발본부)
  • Published : 2015.11.14

Abstract

In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

Keywords