A study on the Construction Procurement System at Multi-Trade Contract Method

다중시공방식에서 합리적인 공사 분리발주 방안

  • Published : 2015.11.14

Abstract

In this paper, to prevent overspending of the CM Fee, Agent CM for the normal work-oriented, Willing to separate order model being used in the construction, using a multi-national grouping Go to offer the right company, a number of groups according to the appropriate CM Fee setting is aimed to suggest a reasonable basis. This paper does not use the domestic point of order characteristic of the model, and using a different theory of affinity grouping projection method is presented. The main disadvantage of the domestic order model because it is a contractual relationship, the contractual relationship as unified as possible by the most reasonable way of construction and construction capabilities and commercialization agreement upon the ability of companies also expect to be very helpful. The grouping by using the multi-order construction of the separation problem of the increase and thus the management object construction type administration was to solve the problem.

Keywords