Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2012.05a
- /
- Pages.333-336
- /
- 2012
Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant
철골 공장가공의 생산성 및 공장간접비율 실태분석
- Published : 2012.05.18
Abstract
In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.
Keywords