A Study on Zoning Model Using Web-Cyclone

웹사이클론을 이용한 조닝모듈 개발에 관한 연구

  • 곽한성 (경북대학교 건축.토목공학부) ;
  • 손창백 (세명대학교 건축공학과) ;
  • 이동은 (경북대학교 건축.토목공학부)
  • Published : 2012.11.16

Abstract

Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.

Keywords