Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2012.11a
- /
- Pages.11-12
- /
- 2012
Temperature Rise of Steel bars Located in a Gang Form Before Placing Concrete During Hot Weather Condition
서중환경시 갱폼 거푸집 내부 철근의 온도변화
Abstract
This study investigates the temperature rise of reinforcement bars located in the middle of the form (for reinforcement concrete) during hot weather condition. The temperature was measured for three consecutive days before placing concrete. Test results showed that the temperature started to increase at 7:00 AM before sun rised, and peaked at around 2:00 PM. It was found that the thinner the diameter of a reinforcement bar, the higher is the speed of temperature rise and drop of the bar. The peak level of temperature for D13, D19, D25 and D32 was 54.4℃, 55.2℃, 56.4℃ and 60.2℃, respectively.