A Study on the Design for Floor Construction which Installed on Next Generation High Speed Train

차세대고속전철 상구조 설계에 대한 연구

  • Published : 2011.05.26

Abstract

Recently, the Next Generation High Speed Train(hereinafter HEMU-400X) which has been developing is the power distribution type high speed train. The power is on every each car and all bogies are installed on the front and rear of every car comparison with KTX and KTX-Sancheon which are consist of power cars and linkable bogies. HEMU-400X can be designed much more seats than others because there are not power car separately. However, that type has no advantage for vibration and noise due to distributed power and more faster design speed. Therefore, in this study, the design of floor construction for preventing the vibration from under the floor is considered.

Keywords