Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2011.11a
- /
- Pages.135-136
- /
- 2011
Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis
생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발
- Published : 2011.11.18
Abstract
A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.