Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2011.11a
- /
- Pages.15-16
- /
- 2011
Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building
고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출
- Published : 2011.11.18
Abstract
Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.
Keywords
- construction automation;
- elemental techniques;
- critical management factor;
- analytic hierarchy process
- 시공 자동화;
- 요소기술;
- 중점 관리사항;
- 계층적 의사결정기법;