경전철프로젝트 시스템엔지니어링기법 적용검토(형상관리방안 기준으로)

A study on the application System Engineering methods for LRT projects (Mainly on Configuration Management methods)

  • 오성효 (서울메트로 김포한강메트로사업단 SE처) ;
  • 이성권 (서울메트로 김포한강메트로 사업단 SE처) ;
  • 박수중 (서울메트로 김포한강메트로 사업단 SE처) ;
  • 김재진 (서울메트로 김포한강메트로 사업단 SE처)
  • 발행 : 2010.06.10

초록

LRT projects pursue fully automated manless operating system with an aim to achieve a minimum availability of 99%. System performance is required to be guaranteed by verified SE procedures to meet user requirements for maintaining system availability above 99%. Configuration Management is one of the most practical SE application methods that manage various changes that may have a major influence on system performance on the process of undertaking assigned projects and find out problems in the system through future tracking systems. This paper discusses further use of Configuration Management in the areas concerned after examining the cases that apply Configuration Management, one of SE application methods, to the ongoing local LRT projects.

키워드