A Study on High-Speed Railway Track Maintenance Scheduling Using ILOG

ILOG를 이용한 고속선 궤도 유지보수 일정계획에 관한 연구

  • Published : 2010.06.10

Abstract

The high-speed railway track occurs train operating result track irregularity, subsidence of the track, ballast abrasion. This is the unusual condition. High-speed railway track maintenance task is the behavior which repairs unusual section by using the human resource or machine resource. The resource used to maintenance task is restrictive. A resource can be efficiently used if the high-speed railway track maintenance scheduling is used. So the more task can be performed in the fit time. In conclusion, this manages the unusual condition of a track efficiently. So additional expenses is minimized cause by deteriorating unusual condition. And it offers comfortable ride to passenger. However, maintenance scheduling has to reflect well practical situation and environment. That's maintenance scheduling is used. We gather the opinions of the hands-on workers. So in this paper define field situation and condition. And suggest mathematical model about this. And we developed the track maintenance scheduling software engine using ILOG.

Keywords