Case of track improvement in the area of redevelopment project surrounding around Seoul Metro Lin.4(R=250m)

서울지하철 4호선 R250m 인접구간 도시개발정비에 따른 궤도방진설계

  • 공선용 (서울메트로 철도토목팀) ;
  • 김상진 (서울메트로 철도토목팀) ;
  • 양태경 (서울메트로 철도토목팀) ;
  • 백찬호 (서울메트로 철도토목팀)
  • Published : 2010.06.10

Abstract

The surroundings around subway are becoming more lively for project of CBD (an redevelopment project), however vibrations which are made through passing train cold spread buildings around. The structure-borne noise could be generated at the same time that makes people including developers and th citizens have negative viewpoint on railway. Especially, Seoul Metro 1-4 lines ar built alongside the road nearby houses and business district. That could make plenty of public resentments because of the structure-borne noise. Seoul Metro should make active alternative plans for their future urban environment projects which will be conducted. The case was Railway Facility which were conducted to minimize structure-borne noise from sharp curved track section (4 line, Sinyongsan~Ichon, R 250m). The section is adjacent to house district as near as 6.6m related with pusing international city project, the 4th urban environment project around international building, near Yongsan station. The interval of sleepers would be downsized in half with breaking existing case, and pad stiffness is reduced 4 ton from 10 ton. That makes structure-borne noise minimized because of vibrations are lowered about 19.1-23.0db. The structure above has remained for a year and a half from October, 2008, and had not any trouble to perform excellence with 80million ton rail accumulated tonnage.

Keywords