Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2010.03a
- /
- Pages.360-368
- /
- 2010
Determination of Construction Method for Noise & Vibration-Free Screw Concrete Piles
무소음.무진동 스크류콘크리트말뚝의 시공법 설정
- Choi, Yong-Kyu (Dept. of Civil & Environ. Engineering, Kyungsung University) ;
- Kim, Dong-Chul (Dept. of Civil & Environ. Engineering, Kyungsung University) ;
- Kim, Sung-Su (Musung Construction Industrial Co, LTD.) ;
- Nam, Moom-S. (Highway & Transportation Technology Institute, Korea Expressway Corporation)
- Published : 2010.03.25
Abstract
Noise and vibration triggered by pile driving in a construction site not only give hard time to the surrounding areas but could also cause residents nearby to file civil complaints to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop low noise & low vibration pile methods. A noise & vibration-free screw concrete pile method proposed in this study is one of the successful outputs. It penetrates pile underground by rotating and pressing in body of the pile to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method.
Keywords
- low noise & vibration pile methods;
- screw pile method;
- noise & vibration free screw concrete pile method;
- pilot test