Application Method for the Structures Under the Full-In Winch on STP Extended Top

STP Extended Top에 설치되는 Pull-In Winch 하부구조 보강방법

  • Kim, Tae-Wook (Samsung Heavy Industries Co. Ltd. Hull Design Team) ;
  • Lee, Myeong-Sil (Samsung Heavy Industries Co. Ltd. Hull Design Team) ;
  • Oh, Tae-Man (Samsung Heavy Industries Co. Ltd. Hull Design Team)
  • 김태욱 (삼성중공업 선체설계팀 선체구조) ;
  • 이명실 (삼성중공업 선체설계팀 선체구조) ;
  • 오태만 (삼성중공업 선체설계팀 선체구조)
  • Published : 2009.09.30

Abstract

The latest trend of development for submarine oil field is caused by the drained oil and gas for ground field, and FPSO is a keyword as the development for submarine oil field. FPSO (Floating Production Storage Offloading) is a kind of vessel type have a topside system for production of oil and gas and store them until the oil or gas can be offloaded onto a tanker or transported through a pipeline. Prior to the introduction of reinforcement under the pull-in winch on the STP extended top as the object of this paper, the technical background shall be introduced such as FPSO and the system and main equipments for STP as follows. The original structural concept for reinforcement of pull-in winch on the STP top and extended structure on moonpool was proposed by buyer's engineering team but it was much modified and improved in accordance with builder's fabrication and construction method.

Keywords