Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference (한국조명전기설비학회:학술대회논문집)
- 2009.10a
- /
- Pages.247-249
- /
- 2009
The Construction Quality Comparison and Analysis by Electric Poles Construction Method
건주 시공법에 따른 시공품질 비교 분석
- Kim, Jeom-Sik ;
- Kwon, Se-Won ;
- Park, Yong-Beom ;
- Mun, Sung-Won ;
- Jo, Seong-Mun ;
- Kim, Do-Young ;
- Ko, Ji-Hoon
- 김점식 (대원전기(주)) ;
- 권세원 (대원전기(주)) ;
- 박용범 (대원전기(주)) ;
- 문성원 (대원전기(주)) ;
- 조성문 (대원전기(주)) ;
- 김도영 (대원전기(주)) ;
- 고지훈 (대원전기(주))
- Published : 2009.10.09
Abstract
Electric pole construction of distribution place is mainly operated by excavation work using auger crane and backhoe. Even though construction quality is affected by electric pole construction method and amount of excavation, construction is operated by workers' convenience in most of construction place. Therefore, in this paper, we analyze and compare effectiveness of electric pole quality using auger crane and backhoe when mechanized excavation through displacement experience of electric pole with ground strength.
Keywords