Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects
공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발
- Published : 2009.11.14
Abstract
It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.
Keywords