한국우주과학회:학술대회논문집(한국우주과학회보) (Bulletin of the Korean Space Science Society)
- 한국우주과학회 2009년도 한국우주과학회보 제18권2호
- /
- Pages.49.1-49.1
- /
- 2009
The Qualification Test of KSLV-I(NARO) Assembly Complex
- Jin, Seung-Bo (Korea Aerospace Research Institute) ;
- Cho, Byoung-Gyu (Korea Aerospace Research Institute) ;
- Lee, Chang-Bae (Korea Aerospace Research Institute) ;
- Chun, Young-Doo (Korea Aerospace Research Institute) ;
- Seo, Dong-Chan (Korea Aerospace Research Institute) ;
- Chung, Eui-Seung (Korea Aerospace Research Institute)
- 발행 : 2009.10.15
초록
Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.
키워드