• Title/Summary/Keyword: the foundation construction cost reduction

Search Result 21, Processing Time 0.026 seconds

A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT) (양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구)

  • Kim, Nam-Il;Kim, Sang-Il;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.518-525
    • /
    • 2009
  • The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.

  • PDF

Structural performance and SWOT analysis of multi-story buildings of lightweight reinforced concrete comprising local waste materials

  • Walid A., Al-Kutti;A.B.M. Saiful, Islam;Zaheer Abbas, Kazmi;Mahmoud, Sodangi;Fahad, Anwar;Muhammad, Nasir;Muhammad Arif Aziz, Ahmed;Khalid Saqer, Alotaibi
    • Earthquakes and Structures
    • /
    • v.23 no.6
    • /
    • pp.493-502
    • /
    • 2022
  • In recent decades, infrastructural development has exploded, particularly in the coastal region of Saudi Arabia. The rising demand of most consumed aggregate in construction can be effectively compensated by the alternative material like scoria which lavishly exists in the western region. Scoria is characterized as lightweight aggregate beneficially used to develop lightweight concrete (LWC) - a potential alternative of normal weight concrete (NWC) ensuring reduction in the structural element's size, increase in building height, comparatively lighter foundation, etc. Hence, the goal of this study is to incorporate scoria-based structural lightweight concrete and evaluate its impact on superstructure and foundation design beside contributing to the economy of construction. Fresh, mechanical, and rheological properties of the novel LWC have been investigated. The structural analyses employ the NWC as well as LWC based structures under seismic and wind loadings. The commercial finite element package - ETABS was employed to find out the change in structural responses and foundations. The cost estimation and SWOT analysis for superstructure and foundation have also been carried out. It was revealed that the developed LWC enabled a more flexible structural design. Notable reduction in the steel and concrete prices of LWC might be possible in the low-rise building. It is postulated that the cost-effective and eco-friendly LWC will promote the usage of scoria as an effective alternative in Saudi Arabia and GCC countries for structurally viable LWC construction.

A Development of u-City Construction Model Considering the Reducing of Operating Cost (운영비 절감을 고려한 u-City 구축 모델 개발)

  • Park, Kwang-Ho;Kim, Dae-Young;Kim, Yun-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.10-22
    • /
    • 2010
  • The first full-scale u-City operation has started in Dongtan u-City. As local cities take over and operate the u-City, unexpected issues arise such as securing the budget of operating costs and self-providing the costs with business models utilizing the u-City assets. The paper presents a strategy for solving these issues. The strategy provides a foundation(infrastructure) for long-term operation models which may reduce the long-term operating costs. In order to establish the economic operating framework of u-City, suggested are some cost-reduction models based on the operating costs structure. For each model, a base framework with comparative analysis of operating costs is provided. With these models, each u-City may select a relevant model according to the characteristics of it. We hope that the framework provides the foundation for efficient and sustainable u-City operations.

A Study on the Loss Reduction Method of Reinforcing Bar through Case Study

  • Park, U-Yeol;Jung, Hyeon-Ok;Kang, Tai-Kyung;Cho, Hun-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.123-132
    • /
    • 2010
  • Rebar work accounts for approximately 30% of the total construction costs for rebars and concrete. Recently, the high rising prices of rebars have become one of the principle factors of rising construction costs. Therefore, construction companies are putting much effort into loss reduction of rebars. Consequently, in this study, we wished to present loss reduction methods of rebars before the preparation of the placing drawings. To devise such methods, we collected previous case studies and analyzed methods that were applied for loss reduction. As a result of the analysis, we were able to find the following methods for loss reduction of rebars: method of reducing the number of splices at the mat foundation, method of reducing splice length at the internal columns or walls of the underground parking lot, method of reducing cap-ties of internal beams of basement floors excluding perimeter beams, and method of reducing anchorage length at the internal column or wall of the underground parking lot. Based on those analysis results, we presented our own loss reduction methods of rebars. Applying our methods resulted in considerable loss reduction.

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

Economic Evaluation on Geosynthetic Reinforced Abutment for Railways (특정형상의 인공자갈이 혼합된 도상자갈층의 지지성능과 응력전달특성)

  • Kim, Dae Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.15-20
    • /
    • 2019
  • This paper evaluated the construction costs of 11 design cases to decrease the horizontal forces applied to the abutment. They include two abutment types, which are to improve backfill materials for a reversed T-shaped abutment and geosynthetic Reinforced Abutment for Railways (RAR). The first type of economic analysis was that the internal friction angles of backfill materials were increased from Φ=35° to Φ=40° and 50° for a reversed T-shaped abutment. In addition, the second type was the cases with the design of geosynthetic RAR. When friction angles of 40° or 50° were applied through the improvement of the backfill material, the decrease in construction cost of the abutment was not large (2.0~3.9%), even though the horizontal forces applied to the abutment had decreased to 18~48%. In the case of applying the RAR, however, a maximum 30% cost reduction was evaluated by the decrease in horizontal force to "0" theoretically. The cost reduction resulted from the decrease in wall thickness, base slab size, and number and material change of pile foundation for the abutment.

Assessment of Optimum Reinforcement of Rebar for Joint of PHC Pile and Foundation Plate (고강도 콘크리트 말뚝과 기초판 접합부의 최적 철근보강량 산정)

  • Park, Jong-Bae;Sim, Young-Jong;Chun, Young-Soo;Park, Seong-Sik;Park, Yong-Boo
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.67-73
    • /
    • 2010
  • Method of protruding steel bar embedded in PHC pile for connecting with foundation plate is an intermediate form of fixed and hinged connection and has often been used in architectural structures such as apartment complex. However, mechanical properties of this method have not been proved and its construction process is not simple. In this study, therefore, by analyzing previous research and by considering ratio of steel bar and concrete in PHC pile, which is minimum reinforcement of rebar, the newly optimized method of reinforcing joint of PHC pile and foundation plate is suggested with respect to PHC pile type (PHC 450, PHC 500, and PHC 600). To assess mechanical properties (ultimate tensile and shear strength) of joint of PHC pile and foundation plate, full scale experimental tests are performed. As a result, all cases are satisfied with required design criteria and can be practically applied. Our results indicate that reduction of rebar reinforcement compared to previous method would lead cost saving in PHC pile construction.

Seismic Performance of the Framed Apartment Building Structure with Damping System (감쇠시스템을 적용한 라멘조 아파트의 내진성능평가)

  • Chun, Young-Soo;Lee, Bum-Sik;Park, Ji-Young
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.181-187
    • /
    • 2017
  • To proactively respond to internal and external changes such as the recent demographic change and rising demand for diversified housing types, this study investigated the framed-structure free plan public house model proposed by the LH to look at the seismic performance of framed-structure apartment according to damper system use through non-linear analysis. The effectiveness thereof was also examined in terms of performance and economy. As a result, the proposed damper system application method to framed-structure free plan public house model was found to meet the performance requirements of the present earthquake-resistant design (KBC2016) and effective to apply to designs. The max response displacement and max response acceleration were compared based on the nonlinear analysis. As a result, the building with damper system showed better earthquake resistance performance than earthquake-resistant structure thanks to the damper system, although the base shear of earthquake-resistant system was reduced by 20% in design. The damper system is expected to help reduce building damage while ensuring excellent earthquake resistance performance. In addition, the framework quantities of earthquake-resistant structure and structure with damping system were compared. As a result, columns were found to reduce concrete amount by about 3.9% and rebar, by about 7.3%. Walls showed about 12.6% reduction in concrete and about 10.7% in rebar. In terms of cost, framework construction cost including formwork and foundation expenses was expected to drop by about 5~6%.