Development of Opened Slab Method for Top-Down Construction
지하역타공법용 개방형 슬래브 개발
- Published : 2008.05.09
Abstract
In Top-Down construction for underground structures, the placement of slab as a horizontal supporting member against lateral earth pressure is an important process in determining construction time and cost. Usually, a reinforced concrete perimeter girder distributes concentrated lateral loads from earth retaining structures such as Cast-in-place (CIP) piles. By combining the function of the R/C perimeter girder and horizontal slabs, the Opened Slab Method is efficient for reducing construction time by elimination of time-consuming formwork for traditional perimeter girders. The structural performance of the method is also discussed in this paper.