Railway Undercrossing Construction Method for the Shindorim Station Platform Extension

신도림 역사 확장을 위한 철도횡단 건설공법 검토

  • Published : 2008.11.07

Abstract

Shindorim Station is the most important transfer station which is crossed Seoul Metro Line-2 and national rail traffic Kyungbu, Honam and Kyungin Line etc.. There is the lagest transfer passengers and the greatest rail traffic. Therefore to solve the congeted station problem, Shindorim station extension project has been planned. This project has very difficult many problems. One of them is undercrossing the national rail traffic ground without open-cut excavation. There are many undercrossing construction methods in our country. But this project is required the best safety. So the best applicable methods are investigated, which are Front-Jacking, NTR and TRcM. In Design stage Front-Jacking with PRS method which is gound reinforcing is applied.

신도림역사는 서울시 지하철 2호선과 경부선,호남선 및 경인선 등 국유철도가 환승하는 정거장으로서 우리나라 최대의 도시철도 환승 승객과 최대의 열차 운행이 이루어지는 매우 중요한 교통의 요충지 이다. 혼잡도가 극심하여 이를 해소하고자 2호선 신도림 역사 확장계획을 수립하였는 바, 본공사 시행에 있어서 가장 어려운 과제인 국유철도 하부통과계획에 대하여 안전하고, 효과적인 방안을 모색하였다. 역사 확장 공사를 시행함에 있어서 국유철도 노반 하부를 비개착 공법에 의하여 안전하게 통과하는 방안에 대하여 국내에 적용되고 있는 공법 중 적용 가능한 공법에 대하여 검토하여 최적의 방안을 도출하고자 하였다. Front-Jacking 공법, NTR 공법, TRcM 공법을 주요 공법으로 검토하였으며 설계단계에서는 Front-Jacking 공법에 지반강성보강을 위한 PRS 공법이 복합된 방안을 적용하였다.

Keywords