A Study on The Load Test Method and Result For Bogie Frame of New LRT

신형 경전철차량 대차프레임 하중시험 방법 및 결과 고찰

  • Published : 2008.11.13

Abstract

Recently, the bogie frame weight of Light Rail Transit system has been reduced in order to save energy and materials. However, this light weighted vehicle structure is very important to verify the fatigue strength at the development stage. Bogie system consists of bogie frame, suspensions, wheel-sets, braking system and transmission system. Among these components, the bogie frame is most significant component subjected to the whole vehicle and passenger loads. In this study, the bogie frame for the New LRT power car is evaluated to the static and fatigue strength. And the evaluation method is used the LRT Performance Test Standards Specification throughout the FEM analysis and static load test. The static and fatigue test results for the LRT bogie frame of power car has been appeared very safety and stable for the design load conditions.

Keywords