Development of Performance Estimate and Verification Process for Next Generation High-speed Prototype Train

차세대고속열차 차량시스 성능예측 및 성능검증 체계 개발

  • 김상수 (한국철도기술연구원 차세대고속열차기술개발사업단) ;
  • 이태형 (한국철도기술연구원 차세대고속열차기술개발사업단) ;
  • 최성훈 (한국철도기술연구원 차세대고속열차기술개발사업단) ;
  • 박춘수 (한국철도기술연구원 차세대고속열차기술개발사업단) ;
  • 한인수 (한국철도기술연구원 차세대고속열차기술개발사업단) ;
  • 목진용 (한국철도기술연구원 차세대고속열차기술개발사업단)
  • Published : 2008.11.13

Abstract

Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And HSR-350x was developed and succeeded in testing of running over 350km/h. The new high-speed train development project, HEMU-400x project, has started since last year. To develop the train system, it is important how we progress the configuration of the system, design, manufacturing and test verification. The authors devised the performance estimate and verification process of the HEMU-400x and the project is performed following the developed processes.

Keywords