Change analysis with A.C of D.C electric railway

직류 전기철도의 교류화 분석

  • 김윤식 (서울메트로, 기술연구소 시스템연구부) ;
  • 이기승 (서울메트로, 기술연구소 시스템연구부) ;
  • 심재석 (서울메트로, 기술연구소 시스템연구부)
  • Published : 2008.11.13

Abstract

The after 1974 capital region electric railroad is opened to traffic Koraill and Seoul metro adopt each other different power supply method and they operate and they are come. AC 25[kv] method voltage the insulation becomes larger standing distance highly, the case tunnel section which will introduce in the underground segment becomes on a large scale and the cost of construction increases to the city center and the underground segment adoption of DC method was many. To recent times with R-bar (Rigid-bar) introductions change of tunnel section the introduction of AC method came to be easy without in the underground segment. Operates sees in the electric protection where the Seoul metro and the Korail are different each other and, from the dead section segment the interior electric light to put out lights the passenger brings about inconveniently and the civil appeal which demands a power supply method unification occurs, within the company interchange electric railroad brazier safety improvement and maintenance expense curtailment etc. the flaw is original proposal, is a condition which finishes a feasibility study service about the power supply method fringe land. Interchange analysis of the DC electric railway it leads from the present paper and it compares under analyzing being it could be reflected to also the route which is in the process of actual using boil the strong point and a weak point of DC and AC method of the establishment route constructive at the time of and

Keywords