준설해사로 충진된 바닥보호공의 형상 및 침투유속평가

Seepage Velocity and Borehole Image of Bottom Protection Layer Filled with Dredged Sand in Sea Dyke

  • 오영인 (한국농촌공사 농어촌연구원 농촌자연환경연구소) ;
  • 강병윤 (한국농촌공사 농어촌연구원 생산자원연구소) ;
  • 김기년 (한국농촌공사 농어촌연구원 생산자원연구소) ;
  • 조영권 (한국농촌공사 농어촌연구원 생산자원연구소)
  • Oh, Young-In (Research Group on Rural Natural Environment, Rural Research Institute, KRC) ;
  • Kang, Byung-Yoon (Productive Resources Research Division, Rural Research Institute, KRC) ;
  • Kim, Ki-Nyeon (Productive Resources Research Division, Rural Research Institute, KRC) ;
  • Cho, Young-Gwon (Productive Resources Research Division, Rural Research Institute, KRC)
  • 발행 : 2008.10.10

초록

After the final closure of sea dyke, seepage behaviour of embankment is highly changed by variation of water head different between tide wave and controlled water level at fresh lake. Especially, the seepage behaviour of bottom protection layer of final closure section is more important factor for structural and functional stability of sea dyke, because of the bottom protection layer of final closure section is penetrated sea side to fresh lake. Even though bottom protection layer was filled with dredged fine sand, it has a high permeability. In this paper, mainly described about the seepage velocity and borehole image of bottom protection layer filled with dredged sand after final closure. Various in-situ tests such as BIPS (Borehole Image Processing System) and ABI (Acoustic Borehole Imager) survey, wave velocity measuring, and color tracer survey were conducted to evaluate the seepage behavior of bottom protection layer. Based on the in-situ tests, the bottom protection layer of final closure section was almost filled with dredged sand which is slightly coarse grain sand and there have sea water flow by water head different between tide wave and controlled water level at fresh lake. Also, comply with tracer survey results, the sea water flow path was not exist or generated in the bottom protection layer. However, because of this result not only short term survey but also just one test borehole survey results, additional long term and other borehole tests are needed.

키워드