Proceedings of the Korean Society for Quality Management Conference (한국품질경영학회:학술대회논문집)
- 2007.04a
- /
- Pages.491-497
- /
- 2007
a hybrid approach for jobshop scheduling with lot-streaming
Abstract
The planning and scheduling is considered as an important function because it influence to the overall performance of production in manufacturing system for supporting global objectives. In this paper, propose the hybrid approach to solve the problem which considered alternative resources and sequences, a sequence-dependent setups and transportation times. The objective of this problem is minimize the makespan with AGV traveling time. A iterative two heuristic algorithm(PSO, SA) is proposed to obtain the sequence of operations and CPLEX package is used to obtain the optimal sub-lot sizes(OLS) when the sequence of operations and greedy-based AGV dispatching rules are fixed or given. we show that performance of iterative two heuristic algorithms and simple numerical experiment.
Keywords