한국건설관리학회:학술대회논문집 (Proceedings of the Korean Institute Of Construction Engineering and Management)
- 한국건설관리학회 2007년도 정기학술발표대회 논문집
- /
- Pages.971-976
- /
- 2007
효율적인 지하지장물 이설을 위한 모범사례분석 및 SUE 적용에 관한 연구
An Analysis of Best Practices for Efficient Utility Relocation and an Inquiry into the Applicability of SUE
초록
미국의 경우 지하지장물의 이설시 발생하는 시설물들의 손상, 간섭으로 인한 작업지연 등이 여전히 미국 건설업의 주요한 문제점 중 하나로 지적되고 있으며, 국내의 경우에도 전기, 통신, 가스, 상
In the U.S., utility damages or utility delay caused by conflicts during the underground utility relocation is one of the weighty problem in the construction industry. Also, in domestic case, delay and additional cost caused by underground utility(i.e, electricity, communication, gas, water supply and sewerage) relocation has been happened so that there is an increase of claims for responsibility between owners and contractors. However, there is insufficient survey for the recent circumstance of additional cost for delay and design changes caused by utility relocation and shortage of enough research for solving and analyzing of causes and their ripple effect. This research presents a result of the study about the best practices of FHWA(Federal Highway Administration), SHAs(State Highway Agencies) and the utility companies managing utility relocation. Also, it presents the basic concept of SUE(Subsurface Utility Engineering), the most reliable tool of FHWA presented, and investigates the developing status about SUE in Korea. At the end of this paper, this research proposes a practical and more applicable study about the efficient utility relocation focusing on local industry.
키워드