Production study of domestic railroad signal checking cycle

국내 철도신호 점검주기의 산출공식 연구

  • Published : 2007.05.17

Abstract

Wave and following checking cycle arbor in the mountains form that examine various theories that decide checking cycle and data and application possibility that can acquire actually were presented. If see in standpoint that breakdown detects singularity availability before change happening, problem is advanced how action of device may do ordinary times supervision (monitoring) or checking cycle. In checking cycle decision, situation of latency breakdown that can not know that cause breakdown before device that is using examines can exist. Example such as car examination, faur and equitable spirit health examination, security device etc. can be fatal the time. Therefore, study and examined arbor in the mountains room of family proper checking cycle.

Keywords